Waste Management and Waste to Energy in Musi River, Palembang


  • Special Tasks:

  • Solving the organic waste and biomass residues, especially water hyacinth in Musi River by processing those materials into solid renewable fuel;
  • Utilizing solid renewable fuel for generating electricity. Solid renewable fuel has been converted to syntetic gas with gasification technology developed by comestoarra.com;
  • Developing electric boat system and distributed hybrid renewable energy charging station in Kemaro Island;
  • Capacity building and transfer knowledge to community in Kemaro Island.

  • Partner: Multi Stakeholders
  • Date: 2023 — current


  Watch Video

Detail Engineering Design RDF 2024


Comestoarra.com was appointed by The Ministry of Environment and Forestry of Indonesia to create Detail Engineering Design (DED) of Communal Based RDF Site Production in Sawahlunto, Padang; Bogor City, West Java; and Cilacap, Central Java On June-July 2024.


  • Partner: Ministry of Environment and Forestry
  • Date: June-July 2024


  Watch Video

DHYRECS Loesche X Comestoarra


Implementation of Distributed Hybrid Renewable Energy Charging Station (DHYRECS) located at Karawang. In collaboration between PT Comestoarra Bentarra Noesantarra with PT Loesche Indonesia.


  • Partner: PT Loesche Indonesia
  • Date: 2024
  • DHYRECS Type: Roadway
  • EV Type: EV Car, EV Motor
  • Delivered Power: 10 kW (max) AC single-phase 220V 50Hz
  • Battery Capacity: 38,4 kWh (max) built from 16 unit VRLA battery @12V 200Ah
  • PV Capacity: 3,48 kWp (6 unit @580 Wp)
  • Generator Capacity: Rated at 5 kW AC single-phase 220V 50Hz
  • Fuel Type: Synthetic gas produced from gasification process


  Watch Video

Co-firing in Non Electricity Industry in Indonesia in 2023


Co-firing in non electricity industry in Indonesia in 2023. In collaboration between PT Comestoarra Bentarra Noesantarra with PT Pupuk Sriwidjaja Palembang.


  • Partner: PT Pupuk Sriwidjaja Palembang
  • Date: 2023


  Watch Video

Community Based Waste to RDF, Gasification Technology, and Distributed Hybrid Renewable Energy Charging Station for Electric Vehicle


Community based waste to RDF, gasification technology, and distributed hybrid renewable energy charging station for electric vehicle in 2023. In collaboration between PT Comestoarra Bentarra Noesantarra with PT Pupuk Sriwidjaja Palembang.


  • Partner: PT Pupuk Sriwidjaja Palembang
  • Date: 2023
  • DHYRECS Type: Roadway
  • EV Type: EV Car, EV Motor
  • Delivered Power: 5 kW (max) AC single-phase 220V 50Hz
  • Battery Capacity: 9,6 kWh (max) built from 4 unit VRLA battery @12V 200Ah
  • PV Capacity: 2,16 kWp (4 unit @540 Wp)
  • Generator Capacity: Rated at 5 kW AC single-phase 220V 50Hz
  • Fuel Type: Synthetic gas produced from gasification process


  Watch Video

CLUERRA Electric Boat


Local based electric boat developed for riverway transportation at Musi River, Palembang. In collaboration between PT Comestoarra Bentarra Noesantarra with PT Pupuk Sriwidjaja Palembang.


  • Partner: PT Pupuk Sriwidjaja Palembang
  • Date: 2023
  • DHYRECS Type: Riverway
  • EV Type: Electric Boat
  • Boat Specification:
  • Battery Capacity: 9,6 kWh (max) built from 4 unit VRLA battery @12V 200Ah
  • PV Capacity: 1,08 kWp (2 unit @540 Wp)
  • Motor Power: 1,5 kW 2 HP AC single-phase 220V 50Hz
  • Gear Reduction Ratio: 1 : 4,2
  • Charger Specification:
  • On Boat PV: 1,08 kWp (2 unit @540 Wp)
  • On Land PV: 2,16 kWp (4 unit @540 Wp)
  • On Land Generator: Rated at 5 kW AC single-phase 220V 50Hz
  • Generator Fuel Type: Synthetic gas produced from gasification process

Agricultural Waste Fuel Blending for Co-firing


Agricultural waste fuel blending for co-firing in 2023. In collaboration between PT Comestoarra Bentarra Noesantarra with PT Bukit Multi Investama.


  • Partner: PT Bukit Multi Investama
  • Date: 2023


  Watch Video

University of Andalas


Waste and biomass residue processing at University of Andalas. In collaboration between PT Comestoarra Bentarra Noesantarra with University of Andalas.


  • Partner: University of Andalas
  • Date: 2023
  • Machines: Crusher and Pelletizer
  • Capacity: 80 — 150 kg/h


  Watch Video

PT PLN Pusharlis


Waste and biomass residue processing at PT PLN Pusharlis. In collaboration between PT Comestoarra Bentarra Noesantarra with PT PLN Pusharlis.


  • Partner: PT PLN Pusharlis
  • Date: 2023
  • Machines: Pelletizer
  • Capacity: 200 — 400 kg/h


  Watch Video

PT PLN (Persero) UID Jakarta Raya


Waste and biomass residue processing at PT PLN (Persero) UID Jakarta Raya. In collaboration between PT Comestoarra Bentarra Noesantarra with PT PLN (Persero) UID Jakarta Raya.


  • Partner: PT PLN (Persero) UID Jakarta Raya
  • Date: 2023
  • Machines: Crusher
  • Capacity: 80 — 150 kg/h

Co-firing in Stocker Boiler


Mixing bottom ash with biomass for co-firing in stocker boiler in 2022. In collaboration between PT Comestoarra Bentarra Noesantarra with PT Indo Pusaka Berau.


  • Partner: PT Indo Pusaka Berau
  • Date: 2022


  Watch Video

PT Adaro Power


Waste and biomass residue processing at PT Adaro Power. In collaboration between PT Comestoarra Bentarra Noesantarra with PT Adaro Power.


  • Partner: PT Adaro Power
  • Date: 2022
  • Machines: Crusher
  • Capacity: 500 — 800 kg/h


  Watch Video

Detail Engineering Design TOSS/RDF 2021


Comestoarra.com was appointed by The Ministry of Environment and Forestry of Indonesia to create Detail Engineering Design (DED) of TOSS. On September 2021, the DED was published to the public.


  • Partner: Ministry of Environment and Forestry
  • Date: September 2021

Technical Member of Bioenergy Development


Comestoarra.com was appointed by The Ministry of Energy and Mineral Resources as a technical member of bioenergy development due to the Decree of The Minister of Energy and Mineral Resources No. 88.K/73/DJE/2020 on 2 June 2020.


  • Partner: Ministry of Energy and Mineral Resources
  • Date: June 2020


  Watch Video

Waste Management and Waste to Energy in Ciliwung River, Jakarta


  • Special Tasks:

  • Implementing community based waste to energy (TOSS methodology) by processing the organic waste and biomass residues in Ciliwung River into solid renewable fuel (pellets);
  • Solid renewable fuel (pellets) has contributed for co-firing in coal fired power plant in Banten area;
  • Solid renewable fuel (pellets) can be used for generating electricity by using gasification technology developed by comestoarra.com;
  • Capacity building and transfer knowledge to community across Ciliwung Riverside.

  • Partner: Multi Stakeholders
  • Date: 2020 — 2022


  Watch Video

Continuous Run Co-firing Test in Coal-Fired Power Plant in Ende District


Continuous run co-firing test in coal-fired power plant in Ende District, Flores, East Nusa Tenggara in 2020 – 2021: In collaboration between PT Comestoarra Bentarra Noesantarra with PT PLN (Persero) UPK Flores.


  • Partner: PT PLN (Persero) UPK Flores
  • Date: 2020 — 2021


  Watch Video

Supply-Value Chain Management Study in Co-firing with Biomass Residues in Ende District


Supply-Value Chain Management Study in Co-firing with biomass residues in Ende District, Flores, East Nusa Tenggara in 2020 – 2021: In collaboration between PT Comestoarra Bentarra Noesantarra with PT PLN (Persero) UPK Flores.


  • Partner: PT PLN (Persero) UPK Flores
  • Date: 2020 — 2021


  Watch Video

Reliability Run Test of Co-firing in Coal-Fired Power Plant in Ende District


Reliability run test of co-firing in coal-fired power plant in Ende District, Flores, East Nusa Tenggara in 2020 – 2021: In collaboration between PT Comestoarra Bentarra Noesantarra with PT PLN (Persero) UPK Flores.


  • Partner: PT PLN (Persero) UPK Flores
  • Date: 2020 — 2021


  Watch Video

Performance Test of Co-firing in Coal-Fired Power Plant in Ende District


Performance test of co-firing in coal-fired power plant in Ende District, Flores, East Nusa Tenggara in 2020 – 2021: In collaboration between PT Comestoarra Bentarra Noesantarra with PT PLN (Persero) UPK Flores.


  • Partner: PT PLN (Persero) UPK Flores
  • Date: 2020 — 2021


  Watch Video

PT Subaken Almech Anetta


Waste and biomass residue processing at PT Subaken Almech Anetta. In collaboration between PT Comestoarra Bentarra Noesantarra with PT Subaken Almech Anetta.


  • Partner: PT Subaken Almech Anetta
  • Date: 2021
  • Machines: Crusher and Pelletizer
  • Capacity: 200 — 400 kg/h


  Watch Video

Koperasi Energi Pancasila


Waste and biomass residue processing at Koperasi Energi Pancasila. In collaboration between PT Comestoarra Bentarra Noesantarra with Koperasi Energi Pancasila.


  • Partner: Koperasi Energi Pancasila
  • Date: 2021
  • Machines: Crusher and Pelletizer
  • Capacity: 200 — 400 kg/h


  Watch Video

Keuskupan Agung Ende


Waste and biomass residue processing at Keuskupan Agung Ende. In collaboration between PT Comestoarra Bentarra Noesantarra with Keuskupan Agung Ende.


  • Partner: Keuskupan Agung Ende
  • Date: 2021
  • Machines: Crusher and Pelletizer
  • Capacity: 80 — 150 kg/h


  Watch Video

Paroki Uludala


Waste and biomass residue processing at Paroki Uludala. In collaboration between PT Comestoarra Bentarra Noesantarra with Paroki Uludala.


  • Partner: Paroki Uludala
  • Date: 2021
  • Machines: Crusher and Pelletizer
  • Capacity: 80 — 150 kg/h


  Watch Video

Co-firing in Coal Fired Power Plant in Jeranjang


Project Coordinator in assessing the continuity supply of refuse derived fuel (waste pellets) from domestic waste and biomass waste for the purpose of 3% co- firing in coal fired power plant in Jeranjang, Lombok, Nusa Tenggara Barat (2019 – 2020).


  • Partner: PT PLN (Persero)
  • Date: 2019 — 2020


  Watch Video

Community Based Waste to Energy Program in Klungkung, Bali


Vice chairman of community based waste to energy program in Klungkung, Bali.


  • Achievment: Second Gold Proper for PT PLN Indonesia Power from the ministry of Environment and Forestry Republic Indonesia
  • Partner: PT PLN Indonesia Power
  • Date: 2019


  Watch Video

Community Based Waste to Energy for Distributed Power Generation Program in Kupang


Project Coordinator on Community based waste to energy for distributed power generation program in Kupang, Nusa Tenggara Timur.


  • Partner: PT PLN (Persero) UP3 Kupang
  • Date: 2019


  Watch Video

Community Based Waste to Energy in Lombok


Community based waste to energy in Lombok, West Nusa Tenggara in 2019. In collaboration between PT Comestoarra Bentarra Noesantarra with PT PLN Indonesia Power.


  • Partner: PT PLN Indonesia Power
  • Date: 2019


  Watch Video

Community Based Waste to Energy in Kupang


Community based waste to energy in Kupang, East Nusa Tenggara in 2019. In collaboration between PT Comestoarra Bentarra Noesantarra with PT PLN (Persero) UP3 Kupang.


  • Partner: PT PLN (Persero) UP3 Kupang
  • Date: 2019


  Watch Video

Community Based Waste to Energy Program in Klungkung


Vice chairman of community based waste to energy program in Klungkung, Bali.


  • Achievment: First Gold Proper for PT Indonesia Power from the ministry of Environment and Forestry, Republic Indonesia
  • Partner: PT PLN Indonesia Power
  • Date: 2018


  Watch Video

Joint Research in Community Based Waste to Energy for Distributed Power Generation in Klungkung


Project Manager of joint research in Community based waste to energy for distributed power generation in Klungkung in 2018.


  • Partner: PT PLN Indonesia Power
  • Date: 2018


  Watch Video

Distributed Hybrid System with Gasification Technology in Klungkung


Distributed hybrid system with gasification technology in Klungkung, Bali in 2017. In collaboration between PT Comestoarra Bentarra Noesantarra with PT PLN Indonesia Power.


  • Partner: PT PLN Indonesia Power
  • Date: 2017


  Watch Video

35.000 MegaWatt Program


A member of kick off meeting in 35000 MegaWatt Program, lead by President Republic of Indonesia, Joko Widodo in 2014.


  • Partner: Ministry of Energy and Mineral Resources
  • Date: 2014